Project

Retrofit Hydrogen Condensed Boiler

A
Geplaatst op 13 juli 20, 13:31 uur

Towards the Introduction of H₂ in the Built Environment

The new developed boiler is a retrofit of an existing domestic natural boiler in which several components, such as the burner and flame guarding system are replaced. The boiler will be tested in a field demo in 2020-2021.

Toelichting

Capacity: 20kW

Project period: 2020-2021

Partners: Gasterra, DNV-GL

Illustration